Use Cat6A copper for new horizontal cabling to desks, cameras and wireless access points, because it supports 10 Gb/s over the full 100 m channel and handles high-power PoE better. Use fibre for backbones between telecom rooms and buildings. Cat6 is still adequate for 1 Gb/s links where budget is tight and 10 Gb/s is not expected.
Quick comparison
| Cat6 | Cat6A | Fibre | |
|---|---|---|---|
| Bandwidth | 250 MHz | 500 MHz | Not applicable (light) |
| 1 Gb/s distance | 100 m | 100 m | Hundreds of metres to kilometres |
| 10 Gb/s distance | About 37 to 55 m | 100 m | 300 m (OM3), 400 m (OM4), 10 km+ (single-mode) |
| Carries PoE | Yes | Yes, with better heat handling | No |
| Typical use | Budget 1 Gb/s outlets | New offices, access points, cameras | Backbones, between buildings, long runs |
When Cat6 is enough
Cat6 supports 1 Gb/s to 100 m, which covers most desktop and camera traffic today. It is thinner and cheaper than Cat6A. It is a reasonable choice for small fit-outs, short-lived installations, or links that will never need more than 1 Gb/s.
Why Cat6A is the default for new buildings
- Supports 10 Gb/s over the full 100 m channel.
- Modern Wi-Fi access points can exceed 1 Gb/s and benefit from multi-gigabit uplinks.
- Higher-power PoE (IEEE 802.3bt, up to 90 W at the switch) heats cable bundles; Cat6A handles this better.
- The cost difference is small compared with re-cabling an occupied building later.
Where fibre belongs
Fibre carries the backbone between the main equipment room and floor telecom rooms, and between buildings. Multimode fibre (OM3 or OM4) suits runs inside a building; single-mode fibre suits long distances and campus links and has the most headroom for future speeds. Fibre is also immune to electrical interference, which matters near heavy power equipment.
Design rules that matter more than the category
- Keep every copper channel within 100 m; place telecom rooms to make that possible.
- Use one category for the whole channel: cable, jacks, patch panels and cords.
- Label every outlet and panel port, and keep records up to date.
- Test every link after installation and keep the reports.
- Leave spare capacity in trays, racks and backbone fibres.