Skip to content
SARDSOLUTION ENGINEERING & TECHNOLOGY
Automation, control & SCADA

PLC, SCADA and building automation in Saudi Arabia

Sard Solution designs and programs automation for plants, utilities and buildings in Saudi Arabia: PLC logic, control panels, SCADA and HMI screens, building management systems (BMS) and remote monitoring. Pumps, valves, HVAC and instruments are wired into one control system and supervised from a single point.

Start a projectCall +966 56 550 8534

What's included

01

PLC programming

Control logic, interlocks and sequences, including Siemens controllers and I/O.

02

Control panels

Panel design, wiring diagrams, assembly supervision and testing.

03

SCADA & HMI

Operator screens, alarms, trends and reports for plants and buildings.

04

Remote monitoring

Secure remote access, alerts and dashboards for unmanned sites.

What you receive

  • Control philosophy and I/O list
  • Panel and wiring drawings
  • PLC and HMI/SCADA programs
  • Factory and site acceptance tests
  • Operation and maintenance manuals
  • Operator training

Who it's for

  • Pumping stations and plant rooms
  • Factories and production lines
  • Buildings that need a BMS for HVAC, lighting and energy
  • Hotels that need guest room management (GRMS)

Codes and standards

  • IEC 61131-3 for PLC programming
  • IEC 61439 for low-voltage control panels
  • Manufacturer platforms including Siemens

How we work

Every project follows the same route, with one team responsible from start to finish.

  1. 01

    Requirement

    You bring a requirement: a new building, an upgrade, or a fault nobody has solved yet.

  2. 02

    Survey

    We visit the site, review the existing systems and agree the scope with you.

  3. 03

    Design

    Drawings, specifications, bills of quantities and a schedule you can approve.

  4. 04

    Integration

    Supply, installation, programming and testing, with every system connected.

  5. 05

    Working system

    Handover with documentation and training, then maintenance and support.

Related projects

All projects
Building management for a pumping plant roomBuilding servicesBuilding management for a pumping plant roomHospitalityGuest room management for a city hotelPCB and sensor modulesField equipmentPCB and sensor modules

Guides and explainers

AutomationPLC vs SCADA vs BMS: what's the difference?PLC, SCADA and BMS explained in plain terms: what each one does, how they work together, and which one your plant or building needs.HospitalityWhat is a GRMS (guest room management system)?How a guest room management system (GRMS) links each hotel room's lighting, air conditioning and door status to the front desk and housekeeping.

Frequently asked questions

What is the difference between PLC, SCADA and BMS?

A PLC is the controller that runs the logic on site. SCADA is the supervisory software that shows operators the whole process, with alarms, trends and reports. A BMS is a control system built for buildings, covering HVAC, lighting, pumps and energy metering. Many projects use all three together.

Which PLC brands do you work with?

Our delivered projects include Siemens controllers and I/O. We select the platform with you based on the existing site, spare-part availability and your maintenance team.

Can you upgrade an old control system?

Yes. We document the existing system, keep what still works and replace obsolete parts in stages to limit downtime. Where boards are no longer supported, we can reverse engineer and rebuild them.

Can we monitor the site remotely?

Yes. We set up secure remote access with alarms and dashboards, so your team sees the status of pumps, equipment and alarms without being on site.

What is a GRMS?

A guest room management system (GRMS) links each hotel room's door lock, lighting and air conditioning to the front desk, showing room status such as occupied, vacant, service and do-not-disturb.

Related services

Electrical designSoftware developmentMaintenance & support

Have a project in mind?

Tell us what you need. We will come back with a scope, a timeline and next steps.

Start a project