PLC vs SCADA vs BMS: what's the difference?

Sard Solution engineering team · · 6 min read

A PLC is a controller that runs logic on site. SCADA is supervisory software that lets operators see and control a whole process. A BMS is a control system designed for buildings. They are layers of the same stack, not competitors, and most large projects use more than one.

What is a PLC?

A programmable logic controller (PLC) is an industrial computer that reads inputs such as sensors, switches and meters, runs a program, and drives outputs such as motors, valves and relays. It is built for harsh environments and runs the same logic continuously, so a pump starts, a valve closes or an alarm trips whether or not anyone is watching.

PLC programs are usually written in the languages defined by IEC 61131-3, such as ladder diagram, function block diagram, structured text and sequential function charts.

What is SCADA?

SCADA (supervisory control and data acquisition) is the software layer above the controllers. It collects data from many PLCs and remote units, shows the process on operator screens (HMI), raises alarms, stores history and produces reports. Operators use SCADA to change setpoints or start and stop equipment, but the PLC still executes the control logic.

SCADA is common in water and pumping networks, power distribution, factories and any process spread across several sites.

What is a BMS?

A building management system (BMS), also called a building automation system (BAS), monitors and controls a building's mechanical and electrical services: chillers and air handling units, ventilation, lighting, pumps, and energy meters. It schedules equipment, keeps temperatures in range, and alerts facility teams to faults.

A BMS uses its own controllers and building protocols such as BACnet, Modbus and KNX, and often integrates other systems such as fire alarm status or access control.

Side-by-side comparison

PLCSCADABMS
What it isHardware controllerSupervisory softwareBuilding control system
Main jobRun control logic on siteMonitor and supervise a processRun building services efficiently
Typical sitesMachines, panels, pump stationsPlants, utilities, multi-site networksOffices, hotels, hospitals, malls
Common protocolsVendor fieldbus, Modbus, PROFINETModbus, DNP3, IEC 60870-5-104, OPC UABACnet, Modbus, KNX
Who uses itControl engineersControl-room operatorsFacility managers

How they work together

In a typical plant, PLCs control each machine or pump set, and SCADA supervises all of them from a control room. In a building, BMS controllers run the HVAC and lighting while a BMS workstation plays the same supervisory role that SCADA plays in a plant. A plant room inside a large building may have its own PLC that reports to the BMS.

Which one do you need?

  • You run a process such as pumping, production or treatment: PLCs for control, plus SCADA if there is more than one unit or site to supervise.
  • You operate a building: a BMS, with PLCs only for specialised plant.
  • You have systems from several vendors that do not talk to each other: an integration layer, which can be SCADA, a BMS or a custom dashboard.

Frequently asked questions

Is SCADA the same as a PLC?

No. A PLC is the hardware controller that runs logic on site; SCADA is the software that supervises many controllers, showing operators screens, alarms and history.

Can a BMS use PLCs?

Yes. Specialised plant such as pump rooms often runs on PLCs that report to the BMS through a protocol such as Modbus or BACnet.

Is a BMS the same as a BAS?

In practice, yes. Building management system (BMS) and building automation system (BAS) are used for the same type of system.

Related services

Automation, control & SCADASoftware developmentMaintenance & support

Have a project in mind?

Tell us what you need. We will come back with a scope, a timeline and next steps.

Start a project